Wednesday, September 18, 2013

Turning a House into a Home Part 4

We finally got the power turned on at our house today. It has been a long drawn-out process that was much impeded by red-tape. And then they didn't put a work order into their system after saying it was there to actually get a crew out until yesterday. 

While the rains last week finally cooled it off it has been HOT working on the house, and humid. And there is a limited amount that can be accomplished without things like power tools, which require power. 

And apparently you can't get electricity turned on without a licensed electrician, then the State inspector and then the power company's approval which took three weeks and then they didn't turn in the paperwork! I called and was told nothing was done and we needed papers from those three people and I about had a coronary. Thankfully after multiple calls and time spent on hold I found someone who knew about the paperwork. Then all I had to do was ask - again for it to be turned on. At least they came out the next day. 
 
A quick recap - its almost time for before and after pictures!
The master bedroom has been painted, walls and ceiling
We now have the hallway and the three bedrooms painted and all that is left to do in them is to lay the floor. Now that we have power we can start on that. 

The laminate flooring in the master bath being removed.
Once Blair removed (in some places chipping off dime size pieces at a time, thanks babe!) the old laminate flooring in the two bathrooms, my brother was able to fix the plumbing on the sink in the master bath, install a new toilet and move the old one into the hall bathroom. 

New toilet and flooring in the master bath
Then my dad and uncle laid new laminate and we started painting the walls white in the bathroom.
We might have half the house completely done by the end of this week now that we have power!